Rescue efforts intensify for 933 people missing at hydropower project sites in Nepal
The National Disaster Risk Reduction and Management Authority (NDRRMA) said on Monday, 933 people were missing from hydropower projects in the flood-hit region.
More than 600 were stranded inside the tunnels of various hydropower projects, waiting to be rescued, the authority said.
So far, 279 people have been rescued from the tunnels of various hydropower projects, including 254 people from Upper Trishuli-1 and 18 from the Langtang Khola site.
The conditions of the others are unknown.
More than 500 employees, workers and engineers of the 216-megawatt Upper Trishuli-1 hydropower project under construction are still out of contact.
Around 400 of them are believed to be inside the tunnels, My Republica news portal reported.
Similarly, 213 people are missing in the Upper Trishuli-3B site, 93 in the Rasuwagadhi site, 42 each in the Upper Trishuli 3A and Langtang Khola sites, seven in Melung Khola, four in the Rasuwa-Bhotekoshi site and two in Middle Trishuli.
Two people are missing at the Trishuli Hydropower site, 16 at the Trishuli 3B Hub Substation, eight at Chilime, and one each in the Devighat Hydropower Plant and the Rasuwa Distribution Centre.
Nepali Army engineers intensified efforts on Sunday to reach people believed trapped inside the Upper Trishuli-3A project tunnel in flood-hit Nuwakot, using heavy equipment and blasting to widen an opening into the buried structure.
According to an update from the Nepal Prime Minister's Office, a joint 90-member rescue team has been deployed at the site, comprising 66 Nepali Army personnel, including a special search and rescue team with trained dogs, 18 Armed Police Force personnel and six Nepal Police personnel.
The team reached the main section of the tunnel, known as the “crown head”, and created a six-square-feet opening.
Rescuers descended through the opening using ropes and called out to those inside but received no response, it said.
Rescue efforts were being continued simultaneously with heavy equipment and blasting, while the opening was being widened to facilitate a faster and more effective operation, according to the PMO update issued Sunday evening.
The Nepali Army has also airlifted excavators and bulldozers to Battar in Nuwakot after dismantling the heavy machinery into sections for helicopter transport, according to the Nepal News web portal.
The tunnel mouth was subsequently located about 40 metres upstream from the vertical hole and about eight metres below it, according to the Ratopati news portal.
However, rescuers have yet to reach the workers believed to be trapped inside.
Expert teams from India and China are assisting the rescuers in these operations.
0 Response to "Rescue efforts intensify for 933 people missing at hydropower project sites in Nepal"
Post a Comment
Disclaimer Note:
The views expressed in the articles published here are solely those of the author and do not necessarily reflect the official policy, position, or perspective of Kalimpong News or KalimNews. Kalimpong News and KalimNews disclaim all liability for the published or posted articles, news, and information and assume no responsibility for the accuracy or validity of the content.
Kalimpong News is a non-profit online news platform managed by KalimNews and operated under the Kalimpong Press Club.
Comment Policy:
We encourage respectful and constructive discussions. Please ensure decency while commenting and register with your email ID to participate.
Note: only a member of this blog may post a comment.