-->
State approves Rs 22 crore flood control projs ahead of monsoon, electoral curbs

State approves Rs 22 crore flood control projs ahead of monsoon, electoral curbs

The Jalpaiguri district Irrigation department confirms the completion of all procedures, including tenders, for the approved projects

Dibyendu Sinha, MP, 12 Mar 2024, Jalpaiguri: The impending monsoon requires completion of crucial work before its arrival, but the specter of potential electoral restrictions looms over ongoing projects. 
To address this, the state Irrigation department has granted approval for 11 flood control projects in northern districts, allocating Rs 22 crore. This decision transpired during a committee meeting at Jalsampad Bhawan in Kolkata last February. 
The Jalpaiguri district Irrigation department confirms the completion of all procedures, including tenders, for the approved projects. Chief engineer Krishnaendu Bhowmick from the North-Eastern Division of the Irrigation department notes: “With the monsoon approaching and potential electoral restrictions, we’ve expedited the tendering and issuance of work orders for approved projects.” 
The state Irrigation department has greenlit a total of 16 flood control projects, with 11 spanning from Malda to Cooch Behar district. Notable among these is the construction of a 280-metre guide dam above the Teesta Barrage to shield the Gazoldoba Tourist Centre Bhorer Alo in the Rajganj Block, estimated at Rs 6 crore 35 lakh. 
Other approved projects include the repair and strengthening of a 2.6 km embankment at Khaerkata in Nagrakata along the right side of the Dayna River. A 1.05 km dam on the right side of the Jaldhaka River in Magurmari, Dhupguri Block, has an estimated cost of Rs 2 crore 65 lakh. 
Flood control initiatives extend to an 800-metre dam on the right side of the Dudua River in Gadong-II Panchayat of Dhupguri (costing Rs 1 crore) and the strengthening of a 650-metre embankment at three locations on the right side of the Reti Sukriti River in Banarhat (costing Rs 1 crore 40 lakh). 
Additional projects include a 165-metre dam on the right side of the Chel River in Mechpara, Kumlai Panchayat, MalBazar Block (estimated at Rs 35 lakh) and improvements to five spurs on the left side embankment of the Teesta River at Dharmapur near Bakali in Maynaguri Block (with a budget of Rs 1 crore 22 lakh). 
Maintenance work is scheduled for the Mujnai River embankment in Jharbeltali and Baganbari areas of Parangerpar, Falakata, Alipurduar district, with an allocated cost of Rs. 77 lakh. 
https://www.millenniumpost.in/bengal/state-approves-rs-22-crore-flood-control-projs-ahead-of-monsoon-electoral-curbs-555666

Related Posts

0 Response to "State approves Rs 22 crore flood control projs ahead of monsoon, electoral curbs "

Post a Comment

Disclaimer Note:
The views expressed in the articles published here are solely those of the author and do not necessarily reflect the official policy, position, or perspective of Kalimpong News or KalimNews. Kalimpong News and KalimNews disclaim all liability for the published or posted articles, news, and information and assume no responsibility for the accuracy or validity of the content.
Kalimpong News is a non-profit online news platform managed by KalimNews and operated under the Kalimpong Press Club.

Comment Policy:
We encourage respectful and constructive discussions. Please ensure decency while commenting and register with your email ID to participate.

Note: only a member of this blog may post a comment.