-->
Second rail track fixed

Second rail track fixed

TT, Siliguri, Sept. 8: The Northeast Frontier Railway said the second track between Telta and Sudhani stations in Bihar had been temporarily restored today for train movement.
Around 12.30pm today, a trial run was conducted on the second track with a goods train running between the two stations at 10kmph.
P.J. Sharma, the chief public relations officer of NFR said: "We expect to start movement of passenger trains along this track by September 10. The track has been certified accurate to run goods train at 10kmph."
The restriction on the speed will remain in force till permanent repairs are carried out, NFR sources said.
The 60m stretch of two tracks had been lying suspended since August 11 and was the only stumbling block to the restoration of train services between the Northeast and the rest of the country.
On August 29, the other track was restored and passenger trains movement along the track started on September 2.
NFR officials said they would introduce eight more pairs of trains from September 16.

Related Posts

0 Response to "Second rail track fixed"

Post a Comment

Disclaimer Note:
The views expressed in the articles published here are solely those of the author and do not necessarily reflect the official policy, position, or perspective of Kalimpong News or KalimNews. Kalimpong News and KalimNews disclaim all liability for the published or posted articles, news, and information and assume no responsibility for the accuracy or validity of the content.
Kalimpong News is a non-profit online news platform managed by KalimNews and operated under the Kalimpong Press Club.

Comment Policy:
We encourage respectful and constructive discussions. Please ensure decency while commenting and register with your email ID to participate.

Note: only a member of this blog may post a comment.